Snowley Park, Peterborough
The local residents of Snowley Park, Peterborough now have a robust, state-of-the-art inclusive playground, easily accessible from both sides of their estate.
05/01/2021 16:00:00
Case Study DetailsOckwells Park, Maidenhead
Surrounded by a nature trail, this playground in the Cox Green area of Maidenhead has a great selection of HAGS play equipment which fills its visitors with delight.
14/12/2020 13:05:00
Case Study DetailsCalvert Green Park, Buckingham
It was time to renew the old playground equipment at Calvert Green Park and Aylesbury Vale District Council chose HAGS to complete this wonderful project.
21/10/2020 13:05:00
Case Study DetailsGet more inspiration from other installations all around the world
View All Case StudiesNexus Core
Core is an activity phenomenon that can be used by all ages. Three gantry posts are designed and built to replicate tree climbing. A honeycomb ladder gives access to those less able whilst the rockface is a true challenge. The looped polished pole and climbing rope encourage physical exercise as do the cargo net climbers. There’s a low level hanging bar to aid inclusivity. The lower and upper netting supports are purposely angled to give access to children of differing heights. And because its so compact it really encourages social interaction. Core needs cognitive skills to work through its many combinations which also encourage role play. Core really brings excitement back to play.
NXCRS(001)

Without Banister
Yellow – Cast In Place
Product Number: NXCRS(001)

6090 x 6730
- Age Range: 7-16
- Assembly Time: 48 hours
- Length (mm): 3460 mm
- Width (mm): 2870 mm
- Height (mm): 3000 mm
- Net Weight: 459.00 kg
- Volume (m3): 14.45 m³
- Safety Area Length (mm): 6090 mm
- Safety Area Width (mm): 6730 mm
- Fall Height (mm): 2500 mm
- Safety Area : 34 m²
-
7-16
-
48
-
2500
-
34
Installation Guides
-
HAGS_Inspection_and_Maintenance_Procedure.pdf
-
HAGS_Inspection_and_Maintenance_Procedure_Apr11_DE.pdf
-
HAGS_Inspection_and_Maintenance_Procedure_Apr11_ES.pdf
-
HAGS_Inspection_and_Maintenance_Procedure_Apr11_FR.pdf
-
HAGS_Inspection_and_Maintenance_Procedure_Apr11_IT.pdf
-
HAGS_Inspection_and_Maintenance_Procedure_Apr11_SV.pdf
-
NEXUS CORE EN ISSUE W_Main.pdf
DWG Files
General Information
Printed
Call a member of our team on: 0845 2601655 or use our Contact Form