Snowley Park, Peterborough
The local residents of Snowley Park, Peterborough now have a robust, state-of-the-art inclusive playground, easily accessible from both sides of their estate.
05/01/2021 16:00:00
Case Study DetailsOckwells Park, Maidenhead
Surrounded by a nature trail, this playground in the Cox Green area of Maidenhead has a great selection of HAGS play equipment which fills its visitors with delight.
14/12/2020 13:05:00
Case Study DetailsCalvert Green Park, Buckingham
It was time to renew the old playground equipment at Calvert Green Park and Aylesbury Vale District Council chose HAGS to complete this wonderful project.
21/10/2020 13:05:00
Case Study DetailsGet more inspiration from other installations all around the world
View All Case StudiesZingo Sep, Poly Slide
The Sep is a multi-play centre that really ticks all the boxes. Its modern, bright colours and use of futuristic shapes and designs gives it real appeal to younger users. It offers social interaction and development as well as challenging, physical exercise, improving motor and cognitive skills. Most important of all it adapts itself to the ability level of the user, from basic exercise and play to more challenging activity. Sep’s main features include twin towers connected by cargo net bridge, a Giant Bubble and a slide (polyethylene and stainless steel options). There’s also a spiral staircase, fireman’s pole and lower level seat.
X-007/P(001)

Green/Orange screen
Multi – Cast In Place
Product Number: X-007/P(001)

7400 x 6810
- Age Range: 3-5
- Assembly Time: 36 hours
- Length (mm): 4600 mm
- Width (mm): 3550 mm
- Height (mm): 2840 mm
- Safety Area Length (mm): 7400 mm
- Safety Area Width (mm): 6810 mm
- Fall Height (mm): 1200 mm
- Safety Area : 37 m²
-
3-5
-
36
-
1200
-
37
Installation Guides
-
101_Main.pdf
-
144.pdf
-
HAGS_Inspection_and_Maintenance_Procedure.pdf
-
HAGS_Inspection_and_Maintenance_Procedure_Apr11_DE.pdf
-
HAGS_Inspection_and_Maintenance_Procedure_Apr11_ES.pdf
-
HAGS_Inspection_and_Maintenance_Procedure_Apr11_FR.pdf
-
HAGS_Inspection_and_Maintenance_Procedure_Apr11_IT.pdf
-
HAGS_Inspection_and_Maintenance_Procedure_Apr11_SV.pdf
-
ZINGO X-007 SEP HAGS ISSUE E_Main.pdf
General Information
Printed
Call a member of our team on: 0845 2601655 or use our Contact Form