Search Advanced Close

To find product downloads simply click on one of the options above and then use the search form displayed to find all the documents associated with your search.

 

Search Advanced Close

To add products to your collection, simply search for products, click 'product details' and from the product page select 'add to my collection'. This can be found either within the product options panel or below the product image.

Search Advanced Close

Ellington Playing Fields, Cambridgeshire

The local residents now have a great space where their children can play and families can exercise outdoors in a natural surrounding, improving both physical and mental wellbeing.

14/09/2020 10:22:00

Case Study Details

Accessible Playground at Canal Way, Reading

Various playground providers presented their tender to the councillors and an action group called Access and Accessibility Forum, but HAGS’ scheme came out as a firm favourite.

19/08/2020 13:09:00

Case Study Details

Inclusive Play at River Road Park, Brentwood, Essex

This recently completed play area in Brentwood has been designed with inclusion high on the agenda. The playground has a fully accessible path and includes a broad range of imaginative and inclusive play opportunities for children of all abilities.

27/07/2020 12:12:00

Case Study Details

Get more inspiration from other installations all around the world

View All Case Studies
Search Advanced Close

Quilmes

Product Number: SAZ-QU

Product Details

Santos

Product Number: SAZ-SA

Product Details

Washington

Product Number: SA-WA

Product Details

Corinthians

Product Number: SAZ-CO

Product Details

Portland

Product Number: SAZ-PO

Product Details

Golden State

Product Number: SA-GS

Product Details

Minnesota

Product Number: SA-MS

Product Details

Oregon

Product Number: SA-OR

Product Details

San Antonio

Product Number: SA-AN

Product Details

Goal End Configuration 7

Product Number: SA-PAGE07

  • Assembly Time 22 hrs 22
Product Details

Games Area Configuration 1

Product Number: SA-PAGA01

  • Assembly Time 50 hrs 50
Product Details

Games Area Configuration 2

Product Number: SA-PAGA02

  • Assembly Time 72 hrs 72
Product Details

Games Area Configuration 3

Product Number: SA-PAGA03

  • Assembly Time 72 hrs 72
Product Details

Goal End Configuration 4

Product Number: SA-PAGE04

  • Assembly Time 18 hrs 18
Product Details

Goal End Configuration 5

Product Number: SA-PAGE05

  • Age Range 5-12 5-12
  • Assembly Time 20 hrs 20
Product Details

Goal End Configuration 6

Product Number: SA-PAGE06

  • Assembly Time 21 hrs 21
Product Details